尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier
China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier

Structure and Working Principle of Prefabricated Flood Control Sub-dike

Price:1
Industry Category: Electrical Equipment & Supplies/Assembly Power Tools/Other Assembly Power Tools
Product Category:
Brand:
Spec:


Contact Info
  • Address:長安區(qū)東勝廣場B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

I. Purpose of Hebei Five-Star Power Equipment Co., Ltd.'s Flood Control Sub-Dike
[Five-Star] The assembled panel dam flood control sub-dike is primarily used for emergency flood control and embankment reinforcement on soft and hard embankments such as sandy loam, loam, clay, concrete, and asphalt.
II. Main Features of the Flood Control Sub-Dike
Hebei Five-Star Power Equipment Co., Ltd.'s [Five-Star] assembled panel dam flood control sub-dike is a new, fast, economical, and environmentally friendly disaster prevention and mitigation device that breaks through traditional thinking modes and abandons conventional dike-building materials and techniques. It features water control using water, high efficiency and speed; flexible dam assembly and strong adaptability; easy storage and transportation with low cost; recyclable and reusable, green and environmentally friendly, among other characteristics.
III. Main Specifications of the Assembled Panel Dam Flood Control Sub-Dike
1. Sub-dike dimensions: 1.2 m * 10 m;
2. Sub-dike unit width: 1 m;
3. Applicable embankment types: sandy loam, loam, clay/concrete, asphalt;
4. Sub-dike height: 1.30/1.35 m;
5. Water retention height: 1.0 m;
6. Original embankment top width: 4.0 m or more;
7. Safety factor k: 2.0-3.35;
8. Design wind speed: 6.0 m/s;
9. Design river width/wave height: 4 km/0.3 m;
10. Gross weight: 260 kg;
11. Net weight: 225 kg;
12. Construction speed: 60 minutes for 100 people/km
IV. Structural Principle of the Assembled Panel Dam Flood Control Sub-Dike
1. Structure and Function of [Five-Star] Assembled Panel Dam Flood Control Sub-Dike
[Five-Star] assembled panel dam flood control sub-dike mainly consists of two parts:
(1) Sub-dike support angle frame: Made of aluminum alloy profiles connected by axles, it is directly installed behind the water-retaining panel using a rotating shaft. It can be folded together with the panel when not in use and quickly deployed as the support framework of the dam body when needed. Beam connecting rod: Made of aluminum alloy square materials connected with special joints, it serves as the connecting support rod of the dam body.
(2) Foldable water-retaining panel: [Five-Star] exclusively developed foldable water-retaining panels are connected into a whole using connecting axles between panels. When not in use, multiple panels can be folded together to reduce space. When in use, they can be instantly unfolded to increase assembly speed. The foldable water-retaining panels are made of corrugated fiberglass materials or specially made color steel plates, aluminum alloy plates, and waterproof PVC plates, which are connected to the beams as a whole through special fixing devices. Their functions: first, as connectors to link adjacent angle frames to form the load-bearing carrier of the dam body; second, as rigid connecting plates. The bottom of the panels is equipped with positioning fixing piles, formed by pressed round steel. Depending on the embankment foundation, there are two usage methods: when applied on soft embankment foundations, they are inverted in the trench to resist displacement; when applied on hard embankment foundations, they serve as positioning water-retaining anti-seepage plates and compacted water-stop elastomers.
V. Working Principle of Hebei Five-Star Power Equipment Co., Ltd.'s Assembled Panel Dam Flood Control Sub-Dike
[Five-Star] assembled panel dam flood control sub-dike adopts the principle of panel dams in hydraulic engineering. It forms a rigid sub-dike body by connecting and fastening multiple angle frames, beams, foldable water-retaining support panels, and other components. The water-retaining support panels function as the water-retaining panels in panel dams. 

Industry Category: Electrical Equipment & Supplies/Assembly Power Tools/Other Assembly Power Tools
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 柳林县| 禹州市| 门头沟区| 盘锦市| 东至县| 乃东县| 仙居县| 普定县| 隆化县| 靖远县| 青川县| 吴江市| 定远县| 龙川县| 南宁市| 兴海县| 敦化市| 千阳县| 民权县| 汕尾市| 赤水市| 常德市| 苗栗市| 麻城市| 昌宁县| 蒙自县| 阳东县| 新泰市| 宜城市| 武夷山市| 白玉县| 青田县| 靖江市| 泰宁县| 临夏市| 武定县| 瑞金市| 平昌县| 台东县| 松桃| 惠州市|