尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China 10-meter long foldable assembled flood control sub-dike - China Supplier
China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier China 10-meter long foldable assembled flood control sub-dike - China Supplier

10-meter long foldable assembled flood control sub-dike

Price:1
Industry Category: Electrical Equipment & Supplies/Assembly Power Tools/Other Assembly Power Tools
Product Category:
Brand:
Spec:


Contact Info
  • Address:長安區(qū)東勝廣場B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

I. Purpose of Hebei Five-Star Power Equipment Co., Ltd.'s Flood Control Sub-Dike
[Five-Star] Assembled Panel Dam Flood Control Sub-Dike is mainly used for emergency flood control and overflow prevention on soft and hard embankments such as sandy loam, loam, clay, concrete, and asphalt.
II. Main Features of the Flood Control Sub-Dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-Dike from Hebei Five-Star Power Equipment Co., Ltd. is a new, fast, cost-effective, and environmentally friendly disaster prevention and mitigation device that breaks through traditional thinking modes and abandons traditional dike-building materials and processes. It features water control through water utilization, high efficiency and speed; flexible dam assembly and strong adaptability; easy storage and transportation with low cost; recyclable and reusable, green and environmentally friendly.
III. Main Specifications of the Assembled Panel Dam Flood Control Sub-Dike
1. Sub-dike dimensions: 1.2 m * 10 m;
2. Sub-dike unit width: 1 m;
3. Applicable embankment types: sandy loam, loam, clay/concrete, asphalt;
4. Sub-dike height: 1.30/1.35 m;
5. Water retention height: 1.0 m;
6. Original embankment top width: 4.0 m or more;
7. Safety factor k: 2.0-3.35;
8. Design wind speed: 6.0 m/s;
9. Design river width/wave height: 4 km/0.3 m;
10. Gross weight: 260 kg;
11. Net weight: 225 kg;
12. Construction speed: 60 minutes for 100 people/km
IV. Structural Principle of the Assembled Panel Dam Flood Control Sub-Dike
1. Structure and Function of the [Five-Star] Assembled Panel Dam Flood Control Sub-Dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-Dike mainly consists of two parts:
(1) Sub-dike support angle frame: Made of aluminum alloy profiles connected by shafts, it is directly installed behind the water-retaining panel using a rotating shaft. It can be folded together with the panel when not in use and quickly deployed as the support framework of the dam body when needed. Beam connecting rod: Made of aluminum alloy square materials connected with special joints, it serves as the connecting support member of the dam body.
(2) Foldable water-retaining panel: The exclusively developed foldable water-retaining panel uses connecting shafts to link multiple panels into an integrated unit. When not in use, several panels can be folded together to save space. When deployed, they can be instantly unfolded to enhance assembly speed. The foldable water-retaining panel is made of corrugated fiberglass material or specially treated color steel plates, aluminum alloy plates, and waterproof PVC plates, which are connected to the beam as a whole through special fixing devices. Its functions: first, as a connecting piece to link adjacent angle frames to form the load-bearing carrier of the dam body; second, as a rigid connecting plate. The bottom of the panel is equipped with positioning fixing piles, formed from round steel. Depending on the embankment foundation, there are two usage methods: when applied to soft embankment foundations, it is inverted in the trench to resist displacement; when applied to hard embankment foundations, it serves to position, retain water, prevent seepage, and compact the water-sealing elastomer.
V. Working Principle of Hebei Five-Star Power Equipment Co., Ltd.'s Assembled Panel Dam Flood Control Sub-Dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-Dike adopts the principle of panel dams in hydraulic engineering. It connects and fastens multiple components such as angle frames, beams, and foldable water-retaining support panels to form a rigid sub-dike body. The water-retaining support panel functions as the water-retaining panel in a panel dam. 

Industry Category: Electrical Equipment & Supplies/Assembly Power Tools/Other Assembly Power Tools
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 黄石市| 宁波市| 汾西县| 常山县| 临沭县| 和平县| 临江市| 扎赉特旗| 崇义县| 栖霞市| 晋江市| 廉江市| 隆昌县| 博罗县| 安溪县| 家居| 缙云县| 视频| 巴楚县| 曲松县| 西平县| 文安县| 中西区| 九龙坡区| 富民县| 孟津县| 拜泉县| 大兴区| 永川市| 金坛市| 江源县| 徐汇区| 繁昌县| 海盐县| 定南县| 保定市| 宁蒗| 茂名市| 昔阳县| 玛沁县| 铁力市|