尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Gray Electrochemical Anti-Rust Steel Structure Pipeline Corrosion-Resistant Zinc Silicate Primer - China Supplier
China Gray Electrochemical Anti-Rust Steel Structure Pipeline Corrosion-Resistant Zinc Silicate Primer - China Supplier

Gray Electrochemical Anti-Rust Steel Structure Pipeline Corrosion-Resistant Zinc Silicate Primer

Price:18..5
Industry Category: Chemicals/Fine Chemical Intermediates/Naphthalene Series Intermediates
Product Category:
Brand:
Spec:


Contact Info
  • Address:任城區(qū)中德廣場(chǎng)C座7樓, Zip: 272400
  • Contact: 王經(jīng)理
  • Tel:13375470791
  • Email:735696328@qq.com

Other Products

Description
Additional Information

Composition:

This product is a two-component coating prepared from silicates, pigments, curing agents, fillers, etc.

Product Characteristics:

Inorganic zinc silicate coatings exhibit unique and excellent performance in adhesion, weather resistance, wear resistance, heat resistance, radiation resistance, solvent resistance, safety, antistatic properties, weldability, and self-healing capabilities.

Application Environment:

During construction, the ambient temperature must not be lower than 5°C, the surrounding air temperature must be at least 3°C above the dew point, the maximum temperature must not exceed 40°C, and the relative humidity must be below 80%.

Storage and Packaging:

Storage: Store in a ventilated and dry place. Shelf life is one year.

Packaging: Component A: 20kg/drum; Component B: 5kg/drum; Mixing ratio: 4:1 (by weight).

Remarks:

1. When using this primer, the base material must be thoroughly stirred, and then the composite film-forming agent and zinc should be mixed uniformly in proportion. Stirring should be maintained during application to prevent uneven zinc distribution. Application time ≤ 4 hours.

2. Theoretical spreading rate: Refers to the consumption of anticorrosive paint without considering the actual application environment, application method, surface condition, structure, shape, surface area, and other influencing factors.

3. The actual drying time of the paint film is generally related to and influenced by air flow, temperature, film thickness, and the number of coats. Therefore, these factors should be considered during construction.

4. Clean with dedicated thinner.

5. After the final topcoat is applied, it must be naturally cured for 7 days before use. If the ambient temperature is below 10°C, the natural curing time should be appropriately extended.

6. Do not dilute with water or other solvents during use.

Industry Category: Chemicals/Fine Chemical Intermediates/Naphthalene Series Intermediates
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 盐边县| 嘉鱼县| 台湾省| 开江县| 玉溪市| 尼木县| 龙山县| 子长县| 桓仁| 甘南县| 宁明县| 西吉县| 拉萨市| 美姑县| 石家庄市| 南汇区| 昌邑市| 青海省| 潍坊市| 唐海县| 雅安市| 同仁县| 抚松县| 武隆县| 新巴尔虎右旗| 邵阳县| 固原市| 博湖县| 平南县| 炎陵县| 十堰市| 郧西县| 崇礼县| 阿拉善盟| 墨江| 大渡口区| 景德镇市| 满城县| 双鸭山市| 遵义县| 长宁区|