Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement

Price:4
Industry Category: Chemicals/Catalysts & Additives/Sizing Agents
Product Category:
Brand:
Spec:


Contact Info

Other Products

Description
Additional Information

Grouting is performed using a dedicated integrated grout preparation and injection machine. The grouting material features micro-expansion, high fluidity, early strength, no bleeding, and extended operability. It not only fills voids but also compensates for or repairs defects in the secondary lining concrete, thereby enhancing the overall quality of the lining concrete.

II. Characteristics of the Tunnel Arch Crown Grouting Process with Formwork:

1. The top of the secondary lining formwork is pre-embedded with grouting pipes and grout vent holes, which also serve as inspection holes to check the fullness of the arch crown concrete.

2. The grouting equipment includes WX-RPC grouting pipes (hereinafter referred to as RPC pipes), micro-expansion slow-setting early-strength filling mortar, and an integrated grout preparation and injection machine. The equipment is simple, easy to move, and operate.

3. The operation is straightforward; grouting for one section of the secondary lining takes only about 2 hours and does not interfere with the normal secondary lining construction schedule.

4. Grouting with formwork can begin when the concrete initially sets. The grouting pressure is significantly higher than that applied after formwork removal, improving the integrity between the lining concrete and the grout, and repairing various concrete defects.

5. During grouting with formwork, the secondary lining concrete is protected by the trolley formwork and remains undamaged. Typically, the concrete pouring pressure exceeds 6 MPa, while the grouting pressure generally does not exceed 1.0 MPa.

III. Key Points of the Tunnel Arch Crown Grouting Process with Formwork:

1. The construction process involves pre-embedding radial grouting pipes in the trolley. Grouting is performed through these pipes promptly 2 hours after the secondary lining construction is completed. The operation can be carried out using a dedicated integrated grout preparation and injection machine. The grouting material exhibits micro-expansion, high fluidity, early strength, no bleeding, and slow-setting properties. It not only serves to fill voids but also compensates for or repairs defects in the secondary lining concrete.

Industry Category: Chemicals/Catalysts & Additives/Sizing Agents
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 克什克腾旗| 兰溪市| 双桥区| 鄱阳县| 淅川县| 安庆市| 宁强县| 鄂托克旗| 延川县| 五指山市| 方正县| 五原县| 泉州市| 余干县| 烟台市| 电白县| 简阳市| 高安市| 余江县| 苍梧县| 镇远县| 沁阳市| 行唐县| 甘泉县| 襄樊市| 山西省| 彭水| 灵山县| 乐至县| 扬中市| 中宁县| 诸暨市| 哈密市| 三门县| 石泉县| 容城县| 屏南县| 柘城县| 乌苏市| 辽源市| 四平市|