尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China ??? ?? ?? ?? ?? - China Supplier
China ??? ?? ?? ?? ?? - China Supplier China ??? ?? ?? ?? ?? - China Supplier China ??? ?? ?? ?? ?? - China Supplier China ??? ?? ?? ?? ?? - China Supplier China ??? ?? ?? ?? ?? - China Supplier

??? ?? ?? ?? ??

??:120,000-150,000
???: Machinery & Industrial Equipment/Textile Equipment and Accessories/Non-woven Fabric Machinery
?? ??:
???: HY
??: HY300-20


Contact Info
  • ??:NO.1 Dongwuheng road, Lianhu Village, Tangxia Town, Dongguan City, Guangdong Prov, China Mainland, Zip: 523712
  • ??: kim
  • ??:13756694353
  • ???:kimu@hengyaomachine.com

?? ??

??
?? ??

Technical Parameters:
 
Machine Size: 10300*3350*1900 mm
Output: 12-38 m/min
Voltage: 220 V/380V
Power: 16 KW
Pressure: 0.6 Mpa
Fuselage material: Aluminium alloy
Note: Some parts should be changed for different size
 
Features:
 
1. Photoelectric detection position.
 
2. Beautiful, strong and rustproof with the aluminum alloy structure.
 
 
Description:
 
This machine is used to welding composite material, Germany and high-performance ultrasonic and waste collector is optional.
 
Our Service:
 
1)Provide 24-hour service hotline.
 
2)Reply and find out solution within the shortest time according to customer's requirement.
 
3)Provide on call service to help customer solve problems.
 
4)Provide free of machine installation as well as commissioning, and inform customer how to do the machine maintenance.
 
5)Prepare customer's feedback tracking within one week after machine installation until meet customer's satisfaction.
 
6)Provide one year guaranty and lifetime maintenance.
 
 
FAQ:
 
1.Q: How is the after sales service?
 
A:We provide 1 year guaranty and technical support lifetime. All machine's parts can be replaced for free within 1 year if broken(excluding error operation).
 
 
 
2.Q: Is it difficult to install the machine?
 
A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video instruction as well.
 
 
 
3.Q: What's the machine lead time?
 
A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM), the lead time is 35-45 days.

???: Machinery & Industrial Equipment/Textile Equipment and Accessories/Non-woven Fabric Machinery
?? ??:
???Brand: HY
??: HY300-20
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Me 宝清县| 克拉玛依市| 岳阳县| 阿瓦提县| 保德县| 文安县| 澄迈县| 阳泉市| 广丰县| 湖口县| 宜昌市| 比如县| 楚雄市| 洞头县| 建湖县| 彭泽县| 西乌珠穆沁旗| 开原市| 涡阳县| 石城县| 鞍山市| 南皮县| 米泉市| 米易县| 湖北省| 颍上县| 锦州市| 岚皋县| 灌阳县| 安阳县| 昆山市| 泸水县| 永春县| 西宁市| 耒阳市| 宝山区| 松滋市| 红河县| 比如县| 赞皇县| 宁海县|