尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier
China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier

Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier

Price:Negotiable
Industry Category: Security & Protection
Product Category:
Brand: 冀虹
Spec: WX-2013


Contact Info
  • Add:長(zhǎng)安區(qū)東勝?gòu)V場(chǎng)B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

Main specifications of the prefabricated folding plate dam flood control sub-dike:
Per set: 10m
Unit width of sub-dike: 1m
Applicable dike materials: sandy loam, loam, clay
Design wind speed: 6.0m/s
Design river width/wave height: 4km/0.3m
Gross weight: 286kg
Net weight: 235kg
Construction speed: 60 minutes for 100 people/km
Structural principle of the prefabricated folding plate dam flood control sub-dike
1. Structural composition and function
Main components of the prefabricated folding plate dam flood control sub-dike:
(1) Corner frame: Made of aluminum alloy profiles connected by shafts, serving as the support framework of the dam body.
(2) Crossbeam: Composed of aluminum alloy square materials connected by **joints, acting as the connecting support members of the dam body.
(3) Water-retaining panel: Made of corrugated fiberglass material, quickly linked via hinges and connected to the crossbeam as a whole through **fixing devices.
Its functions: first, as a connector to link adjacent corner frames, forming the load-bearing carrier of the dam body;
second, as a rigid connecting plate.
(4) Rubber elastomer: Made of high-quality rubber with elastic functionality, used for sealing and water retention between adjacent support panels.
(5) Positioning fixing pile: Formed by pressing round steel.
2. Working principle
The prefabricated folding plate dam flood control sub-dike applies the principle of face rockfill dams in hydraulic engineering. Multiple corner frames, crossbeams, and water-retaining panels are connected to form a rigid sub-dike body, with the water-retaining panels serving the water-blocking function of a face rockfill dam. During construction, it is embedded into the dike foundation soil to prevent seepage around the structure.

Industry Category Security & Protection
Product Category
Brand: 冀虹
Spec: WX-2013
Stock: 9999
Manufacturer:
Origin: China / Hebei / Shijiazhuangshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Me 平江县| 巴东县| 峨眉山市| 江永县| 益阳市| 巢湖市| 铁岭县| 墨竹工卡县| 镇赉县| 岐山县| 肃南| 锡林郭勒盟| 望奎县| 个旧市| 昌平区| 南平市| 肇庆市| 宁陕县| 河北省| 马公市| 堆龙德庆县| 乡宁县| 大名县| 永登县| 兴业县| 丰县| 夏津县| 乌兰浩特市| 道孚县| 潢川县| 深州市| 志丹县| 上栗县| 黔东| 内江市| 肇州县| 沿河| 仙居县| 巩留县| 卢龙县| 原平市|