尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier
China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier

Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument

Price:Negotiable
Industry Category:
Product Category:
Brand: 標創(chuàng)儀器
Spec: DT-6500


Contact Info
  • Add:鶴壁市山城區(qū)朝陽街東段, Zip: 458000
  • Contact: 周經(jīng)理
  • Tel:13503920302
  • Email:

Other Products

Description
Additional Information

Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument Bauxite Testing Instrument Fully Automatic Bauxite Analysis Equipment High-Precision Bauxite Detection Instrument


1 Power Switch: Used to turn the entire machine's power on or off

2 Cuvette: Used to hold the colorimetric solution

3 Drain Button: Drains the solution from the cuvette

4 Display: Shows the instrument's operation interface.

5 Main Unit: Computer main chassis.

Chapter 3 Basic Usage of the Instrument

I. Connection and Power-On of the Instrument

Connect the main unit's power socket to the mains power supply using the power cord, and ensure the instrument is reliably grounded (otherwise, it may be susceptible to interference, causing data fluctuations); check if the drainage hose is securely installed (do not submerge the outlet end of the drainage hose into the waste liquid to avoid poor drainage), and fill the cuvette with distilled water (reference solution). Turn on the computer power, run the element analyzer application, and then turn on the instrument's power switch.

II. Establishment of the Calibration Curve

Establish the calibration curveOn the main interface, select the element symbol to be calibrated, click Calibrate to enter the calibration interface

Step 1: Click Full Scale (100)-----Drain water and pour in the solution------Click A Value Input------Enter the calibration value-----Click C Value % Input.

Step 2: Enter the weight value of the analytical standard sample in mg.

Step 3: Click Establish Curve. If saving other curves, change the curve number.

For multi-point calibration, repeat Step 1. Only after the calibration curve is established within the instrument can sample testing be performed.

Industry Category
Product Category
Brand: 標創(chuàng)儀器
Spec: DT-6500
Stock: 16
Manufacturer:
Origin: China / Henan / Hebishi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 屏东县| 西贡区| 信阳市| 观塘区| 大兴区| 蓬溪县| 子长县| 吴川市| 宁城县| 榆中县| 分宜县| 通州区| 宜黄县| 临湘市| 克什克腾旗| 驻马店市| 进贤县| 普洱| 泸州市| 龙胜| 灯塔市| 仪陇县| 肥乡县| 松溪县| 恩施市| 洪雅县| 邵东县| 阳东县| 大埔区| 博白县| 合水县| 龙南县| 榆树市| 锡林郭勒盟| 乡宁县| 寻甸| 布拖县| 吉木萨尔县| 凌源市| 麦盖提县| 文山县|