尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Wireless Solar Potential Collector Intelligent Test Pile - China Supplier
China Wireless Solar Potential Collector Intelligent Test Pile - China Supplier China Wireless Solar Potential Collector Intelligent Test Pile - China Supplier China Wireless Solar Potential Collector Intelligent Test Pile - China Supplier China Wireless Solar Potential Collector Intelligent Test Pile - China Supplier China Wireless Solar Potential Collector Intelligent Test Pile - China Supplier

Wireless Solar Potential Collector Intelligent Test Pile

Price:¥150
Industry Category:
Product Category:
Brand: 邦信防腐
Spec: CS-2


Contact Info
  • Add:金水區(qū)花園路黃河建工大廈, Zip:
  • Contact: 李欣濤
  • Tel:18848842860
  • Email:

Other Products

Description
Additional Information

Test posts are installed along the natural gas pipeline. There are three types of test posts: potential test posts, current test posts, and insulation test posts. Insulation test posts are installed at pipeline insulation joints. Test posts can also serve as route mileage markers. Adjustments can be made based on specific field conditions. Additional test posts may be added in cases such as directional drilling. The specific locations and quantities of test posts can be adjusted during construction according to field conditions.
Test posts are generally located along roadsides, field ridges, or ditch edges, close to the pipeline excavation. They should be placed as near as possible to sections where the pipeline crosses rivers, ponds, ditches, or roads.
Test posts should be installed at the following locations:
Where the pipeline crosses or runs parallel to AC/DC electrified railways; at insulation joints;
at grounding system connection points;
at metal casing locations; where connections are made to other pipelines or facilities; at auxiliary test coupon and grounding device connection points;
where the pipeline crosses external pipelines;
where the pipeline crosses major roads or embankments; where it crosses railways or rivers;
where it is adjacent to external metal structures.
Cathodic protection test devices should be installed simultaneously with the cathodic protection system. Test devices should be arranged along the pipeline route, with intervals between adjacent test devices not exceeding 3 km. In urban or industrial areas, the interval should not exceed 1 km; in areas affected by stray current interference, test devices may be appropriately increased. Test devices should be installed above the pipeline and clearly marked. Smart test posts should monitor the following parameters: DC pipe-to-soil potential, test coupon instant-off potential, test coupon current; AC voltage, AC current. The area of the DC potential test coupon should be 6.5–10 cm2, and the area of the AC test coupon should be 1.0 cm2.
For station-area cathodic protection, installing test posts is not recommended. Instead, reference tubes should be buried at locations where pipe-to-soil potential measurements are needed to facilitate the placement of portable reference electrodes. Any above-ground metal can serve as a contact point for the red probe during measurements. Since all pipelines within the station are interconnected and form an equipotential body, connecting at any location to the station structure will not affect potential readings.
(1) Test devices should be installed at the following locations:
① Insulation joints;
② Metal casing locations;
③ Test coupon and drainage grounding device connection points;
④ Auxiliary anode locations, sacrificial anode installation points;
⑤ Pipeline directional drilling crossing points.
(2) Smart test posts should be installed at the following locations:
① Where pipeline characteristics are discontinuous (elbows, phase changes of high-voltage lines, turning points);
② Locations with low soil resistivity;
③ Cathodic protection station drainage points, midpoints of cathodic protection stations;
④ Locations affected by DC interference.
(3) Other considerations:
① Install potential test coupons every 5–10 km along the pipeline;
② When metal casings have high-quality coatings, leave a 2-meter bare section at both ends of the casing;
③ Ensure electrical continuity between valve room instruments and the valve body, with the valve body connected to the grounding grid via lightning arresters or DC decouplers;
④ Install surge protection devices at all insulation isolation points.

Industry Category
Product Category
Brand: 邦信防腐
Spec: CS-2
Stock: 1800
Manufacturer:
Origin: China / Henan / Zhengzhoushi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 金塔县| 沂南县| 开封市| 安岳县| 剑河县| 南通市| 军事| 镇原县| 磐安县| 玉溪市| 丰镇市| 峨眉山市| 石狮市| 伊宁县| 嘉义县| 竹溪县| 钦州市| 云南省| 宜兰县| 曲麻莱县| 辽源市| 红河县| 松滋市| 吉安县| 长岭县| 运城市| 清苑县| 丁青县| 松溪县| 武汉市| 杭锦后旗| 新巴尔虎左旗| 永仁县| 万源市| 普兰店市| 山阴县| 万年县| 山西省| 申扎县| 汾阳市| 若尔盖县|