尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Traction motor stator testing system - China Supplier
China Traction motor stator testing system - China Supplier China Traction motor stator testing system - China Supplier China Traction motor stator testing system - China Supplier

Traction motor stator testing system

Price:面議
Industry Category: Instruments & Meters/Testing Machines/Other Testing Machines
Product Category:
Brand: 長牛科技
Spec: CN-2N-ATE


Contact Info
  • Add:余杭區(qū)余杭街道金星村西部科技園C座101室, Zip: 311121
  • Contact: 劉曉梅
  • Tel:13758209206
  • Email:sales@hzchangniu.com

Other Products

Description
Additional Information

Elevator Traction Machine Motor Stator Testing System Overview:
The traction machine testing system uses a Pentium-level industrial computer for centralized control. All test items can be completed with a single wiring connection, and the test results are automatically analyzed, judged, counted, stored, and printed (printer to be provided by the buyer). All user parameters can be preset for invocation during testing.
Test Items: DC Resistance, Insulation Resistance, Electrical Strength, Inter-turn Test, Thermistor
1、DC Resistance: Measure the resistance of each motor winding.
2、Insulation Resistance: Measure the insulation resistance between the stator windings and the iron core.
3、Electrical Strength: Withstand voltage test between the main coil and the iron core, and between the main coil and the thermal switch.
4、Inter-turn Test: Measure the inter-turn performance of the winding coils.
5、Thermistor: Measure the resistance value of the thermistor.
5、Power Supply:AC220V±10%,50Hz±2 Hz(System operating power)
6、Operating Environment: Operating Temperature 0~40 oC
Operating Humidity 90%

Traction Motor Stator Test Bench Test Item Functions
1 Resistance Measurement:
Three-phase:AB line resistance,AC line resistance,BC line resistance,judgment of three-phase resistance imbalance with prompts, adjustable measurement time (1-99 seconds).
2、 Withstand Voltage Measurement:
Measure the leakage current between the winding and the iron core, adjustable measurement time 1-99seconds).
3、 Insulation Measurement:
Insulation resistance between coil-iron core, adjustable measurement time (1-99seconds).
4、 Inter-turn Measurement:
Three-phase:AB phase,AC phase,BC phase inter-turn insulation performance, adjustable measurement time (1-99 seconds).
5、Thermistor Resistance Measurement: Adjustable measurement time (1-99 seconds), measure the resistance value of the thermistor.
6、Thermistor Withstand Voltage Test: Withstand voltage test between the main coil and the thermal switch, adjustable measurement time (1-99 seconds)
Traction Motor Stator Test Bench Testing Process:
1、Start Method: The software is divided into hardware start and software start.
2、Automatic Testing Process: Test according to the set sequence and set time.
3、Flexible adjustment of measurement sequence, measurement time, and number of measurement items is possible.
Default measurement sequence: DC resistance/thermistor/insulation resistance//motor inter-turn/withstand voltage leakage current. The test sequence can be adjusted or set to skip certain tests .

 

Industry Category Instruments & Meters/Testing Machines/Other Testing Machines
Product Category
Brand: 長牛科技
Spec: CN-2N-ATE
Stock: 9
Manufacturer:
Origin: China / Zhejiang / Hangzhoushi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 阿尔山市| 松江区| 鲁山县| 江达县| 徐闻县| 宜宾县| 邢台市| 汤阴县| 噶尔县| 开封市| 城市| 从江县| 栾城县| 阳西县| 闻喜县| 胶南市| 长宁区| 凤城市| 黔西| 星子县| 崇仁县| 通山县| 荔波县| 临桂县| 蓬安县| 聊城市| 广安市| 湖南省| 株洲县| 宜兰县| 呼图壁县| 阿鲁科尔沁旗| 洪湖市| 西贡区| 栾城县| 许昌县| 武汉市| 高尔夫| 虎林市| 汨罗市| 安顺市|