What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably along walls, columns, or beams.

2. Based on the routing direction of cable trays and wireways, the civil and structural engineering disciplines should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical disciplines is essential.

3. The wiring design for underground concealed metal wireways must be closely coordinated with civil engineering, with routes and equipment selection rationally determined according to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are laid on the same cable tray, a partition should be added in the middle for isolation.

5. When no additional concentrated load is considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray is calculated based on the even distribution of the cable's self-weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) The cable tray should be above corrosive liquid pipelines.

(2) The cable tray should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, the cable tray should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, the cable tray should be below the pipeline.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should meet relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 金塔县| 奎屯市| 同心县| 通河县| 邹平县| 清河县| 专栏| 肇东市| 鄂托克前旗| 盐亭县| 南投县| 民县| 峨眉山市| 时尚| 凤城市| 新乡县| 新泰市| 合作市| 涪陵区| 红桥区| 全椒县| 兰考县| 北海市| 仁寿县| 渝北区| 泸定县| 南雄市| 六枝特区| 怀柔区| 勐海县| 青岛市| 江华| 莱芜市| 聂拉木县| 古丈县| 吉木乃县| 井研县| 罗平县| 修武县| 绵阳市| 淳化县|