What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably installed along walls, columns, or beams.

2. Based on the installation direction of cable trays and wireways, the civil and structural engineering teams should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical engineering disciplines is essential.

3. The wiring of underground concealed metal wireways must be closely coordinated with civil engineering design, with route planning and equipment selection tailored to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are installed in the same cable tray, a partition should be added in between for isolation.

5. When no additional concentrated load is considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray should be calculated based on the even distribution of cable weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) The cable tray should be above corrosive liquid pipelines.

(2) The cable tray should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, the cable tray should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, the cable tray should be below the pipeline.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should meet relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Electrical & Electronics
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經營性-2023-0192
ChatGlobal Chat Me 微博| 惠水县| 嘉祥县| 青河县| 彩票| 玛纳斯县| 全州县| 紫金县| 开原市| 浮梁县| 河间市| 高安市| 梨树县| 托克托县| 嘉鱼县| 于都县| 周宁县| 澎湖县| 山东| 疏附县| 江门市| 明溪县| 彭阳县| 登封市| 登封市| 中方县| 闸北区| 筠连县| 通化县| 石屏县| 长宁区| 电白县| 曲水县| 镇原县| 平罗县| 巢湖市| 连山| 河西区| 嘉峪关市| 龙海市| 富民县|