Description
Additional Information

What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably installed along walls, columns, or beams.

2. Based on the installation direction of cable trays and wireways, the civil and structural engineering teams should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical engineering disciplines is essential.

3. The wiring of underground concealed metal wireways must be closely coordinated with civil engineering design, with route planning and equipment selection tailored to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are installed in the same cable tray, a partition should be added in between for isolation.

5. When no additional concentrated load is considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray should be calculated based on the even distribution of cable weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) The cable tray should be above corrosive liquid pipelines.

(2) The cable tray should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, the cable tray should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, the cable tray should be below the pipeline.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should meet relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 文昌市| 黄平县| 蒲城县| 威远县| 慈利县| 敦化市| 论坛| 孝感市| 深泽县| 天水市| 合川市| 青河县| 田林县| 甘泉县| 隆林| 邢台县| 永清县| 虞城县| 阿克陶县| 永顺县| 五指山市| 通道| 蚌埠市| 石城县| 卢湾区| 安新县| 囊谦县| 彰武县| 临夏市| 赤城县| 灌阳县| 临颍县| 江阴市| 安平县| 锦屏县| 新竹市| 陕西省| 丁青县| 安庆市| 临汾市| 随州市|