尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Step Bridge - China Supplier
China Step Bridge - China Supplier

Step Bridge

Price:Negotiable
Industry Category: Electrical & Electronics
Product Category:
Brand:
Spec:


Contact Info
  • Add:武漢市硚口區(qū)古田二路海爾國(guó)際廣場(chǎng)9號(hào)樓1910, Zip:
  • Contact: 徐遠(yuǎn)龍
  • Tel:15997491217
  • Email:2742197770@qq.com

Other Products

Description
Additional Information

What are the key installation points for ladder-type cable trays?

1. The routing of ladder-type cable trays and wireways should be short and direct, preferably installed along walls, columns, or beams.

2. Based on the intended routing of cable trays and wireways, the civil and structural engineering disciplines should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical disciplines is essential.

3. The wiring design for underground concealed metal wireways must be closely coordinated with civil engineering, with route planning and equipment selection tailored to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are installed in the same cable tray, a partition should be added for isolation.

5. When additional concentrated loads are not considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder-type cable tray should be calculated based on the even distribution of cable weight.

6. Ladder-type cable trays should not be laid parallel to the following pipelines. If unavoidable, the placement of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) The cable tray should be above corrosive liquid pipelines.

(2) The cable tray should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, the cable tray should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, the cable tray should be below the pipeline.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should adhere to relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Electrical & Electronics
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Me 闽清县| 陆川县| 洱源县| 东安县| 汾阳市| 哈尔滨市| 麟游县| 新龙县| 汉沽区| 江门市| 剑阁县| 施甸县| 修水县| 深州市| 鄂伦春自治旗| 四川省| 二连浩特市| 枞阳县| 休宁县| 郁南县| 浦县| 綦江县| 旅游| 杭锦旗| 武陟县| 合川市| 阿克陶县| 普兰县| 汉沽区| 正蓝旗| 沅江市| 丹巴县| 马尔康县| 澎湖县| 邢台市| 新野县| 广灵县| 兰考县| 德庆县| 广南县| 奉化市|