尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Model 260 Silicone Aerator - China Supplier
China Model 260 Silicone Aerator - China Supplier

Model 260 Silicone Aerator

Price:Negotiable
Industry Category: Chemicals/Organosilicon/Siloxanes
Product Category:
Brand:
Spec:


Contact Info
  • Add:宜興市和橋鎮(zhèn)派出所對面, Zip: 214211
  • Contact: 蘇愛萍
  • Tel:0510-87807383
  • Email:web@js-tianliao.com

Other Products

Description
Additional Information

Advantages 
    The diaphragm microporous aerator is the latest aeration device developed in the 1980s. It features small bubble diameter, large gas-liquid interface area, uniform bubble diffusion, no pore clogging, and strong corrosion resistance. Tests conducted by the School of Environmental Engineering at Tongji University in Shanghai and the North China Municipal Engineering Design Institute on oxygen transfer in clean water and wastewater, along with over 50 users' years of satisfactory operation, demonstrate its excellent performance (40% energy reduction compared to conventional fixed spiral aerators, diffused aeration devices, and perforated pipe aerators, or a 40% increase in wastewater treatment capacity). It is particularly suitable for new and expanded urban wastewater and large factory aeration tanks, as well as the renovation of old aeration tanks, and the aeration tank can operate intermittently.

Aeration Pipeline Connection and Installation
    The aeration system consists of aerators, air distribution pipes, tees, elbows, regulators, connectors, and cleaning devices. The air distribution pipes are typically arranged in a ring layout, with aerator density based on air supply and tank shape. Aerators and air distribution pipes are connected via G3/4 threaded connections, with the base having internal threads (fixed to the air distribution pipe) and the aerator having external threads. During installation, first secure the regulator to the tank bottom with expansion bolts according to the required dimensions, then fix the air distribution pipe to the regulator using clamps. To prevent damage from other operations such as welding sparks and construction activities like concrete pouring, aerators should be installed after civil works are completed and before filling the tank with water. To check for leaks in pipes and connections, fill the tank with water to a level 10 cm above the aerators and conduct a pressure test. If any leaks are found in the pipe connections, address them promptly before正式 commissioning.

Main Technical Parameters
    Aerator specifications: 260 type, 215 type                                           Oxygen utilization rate: (water depth 3.2mm) 18.4-27.7%
    Service area: 0.35-0.75m2/unit, 0.25-0.55m2/unit               Oxygenation capacity: 0.112-0.185 KgO2/m3h
    Average pore size of aeration membrane during operation: 80-100 microns                            Oxygenation efficiency: 4.46-5.19 KgO2/m3h
    Air flow rate: 1.5-3 m3/unit h                                                    Aeration resistance: 180-280 mmH2O
    Overall oxygen transfer coefficient: kLa(20°C) 0.204-0.337 min?1
    The air pipe design should consider pressure balance, preferably forming a ring network. Each inlet pipe should have a valve to facilitate air flow regulation. The design velocity for air pipes: main pipes 10-15 m/s; branch pipes 5 m/s. Installation height of aerator surface from tank bottom: 270mm, 250mm, and 200mm for push-plate type.

Industry Category Chemicals/Organosilicon/Siloxanes
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 伊宁市| 乡宁县| 寿宁县| 汶川县| 百色市| 石屏县| 临沂市| 屏东县| 随州市| 英吉沙县| 龙游县| 岗巴县| 巴南区| 军事| 修水县| 资阳市| 永新县| 乌兰县| 阿克苏市| 慈利县| 雷州市| 乐陵市| 兖州市| 合川市| 红安县| 樟树市| 灵川县| 荆门市| 盐津县| 泸州市| 光山县| 塘沽区| 延长县| 全州县| 永吉县| 秀山| 南溪县| 富平县| 东乡县| 日喀则市| 邓州市|