Advantages 
    The diaphragm microporous aerator is the latest aeration device developed in the 1980s. It features small bubble diameter, large gas-liquid interface area, uniform bubble diffusion, no pore clogging, and strong corrosion resistance. Tests conducted by the School of Environmental Engineering at Tongji University in Shanghai and the North China Municipal Engineering Design Institute on oxygen transfer in clean water and wastewater, as well as over 50 users' years of application, have shown excellent performance (40% energy reduction compared to conventional fixed spiral aerators, diffuser aerators, and perforated pipe aerators, or a 40% increase in wastewater treatment capacity). It is particularly suitable for new and expanded urban wastewater and large factory aeration tanks, as well as the renovation of old aeration tanks, and the aeration tank can operate intermittently.

Connection and Installation of Aeration Pipelines
    The aeration system consists of aerators, air distribution pipelines, tees, elbows, regulators, connectors, and cleaning devices. The air distribution pipelines are typically arranged in a ring layout, with aerator density based on air supply and tank shape. Aerators are connected to the air distribution pipelines using G3/4 threaded connections, with the base having internal threads (fixed to the air distribution pipeline) and the aerator having external threads. During installation, first secure the regulator to the tank bottom with expansion bolts according to the required dimensions, then fix the air distribution pipeline to the regulator using clamps. To prevent damage from other operations such as welding sparks and construction activities like concrete pouring, aerators should be installed after civil works are completed and before filling the tank with water. To check for leaks in pipelines and connections, fill the tank with water to a level 10 cm above the aerators, then introduce air. If any leaks are found at pipeline connections, address them promptly before正式 operation.

Main Technical Parameters
    Aerator specifications: 260 type, 215 type                                           Oxygen utilization rate: (water depth 3.2mm) 18.4-27.7%
    Service area: 0.35-0.75m2/unit, 0.25-0.55m2/unit               Oxygenation capacity: 0.112-0.185 KgO2/m3h
    Average pore size of aeration membrane during operation: 80-100 microns                            Oxygenation efficiency: 4.46-5.19 KgO2/m3h
    Air flow rate: 1.5-3 m3/unit h                                                         Aeration resistance: 180-280 mmH2O
    Overall oxygen transfer coefficient: kLa(20°C) 0.204-0.337 min?1
    The air pipeline design should consider pressure balance, preferably forming a ring network. Each inlet pipe should have a valve to facilitate air flow regulation. Design flow velocity for air pipelines: main pipe 10-15 m/s; branch pipe 5 m/s. Installation height of aerator surface from tank bottom: 270mm, 250mm, push plate type 200mm.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 任丘市| 乌兰浩特市| 新泰市| 高安市| 积石山| 兴海县| 德清县| 巴彦县| 土默特左旗| 蓬安县| 松桃| 平顺县| 互助| 宜良县| 分宜县| 疏勒县| 惠来县| 静海县| 巴南区| 绥化市| 简阳市| 泉州市| 彩票| 七台河市| 隆子县| 阳城县| 江西省| 靖西县| 廉江市| 桓仁| 天全县| 泾源县| 邯郸县| 将乐县| 通许县| 武陟县| 筠连县| 贡觉县| 武山县| 松阳县| 望奎县|