尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Instrument for measuring the combustion value of flame-retardant building materials - China Supplier
China Instrument for measuring the combustion value of flame-retardant building materials - China Supplier China Instrument for measuring the combustion value of flame-retardant building materials - China Supplier China Instrument for measuring the combustion value of flame-retardant building materials - China Supplier China Instrument for measuring the combustion value of flame-retardant building materials - China Supplier China Instrument for measuring the combustion value of flame-retardant building materials - China Supplier

Instrument for measuring the combustion value of flame-retardant building materials

Price:Negotiable
Industry Category:
Product Category:
Brand: 英特儀器
Spec: ST-9000D


Contact Info
  • Add:鶴壁市長(zhǎng)風(fēng)路, Zip: 458000
  • Contact: 師文亮
  • Tel:0392-2700039
  • Email:598945101@qq.com

Other Products

Description
Additional Information

Instrument for measuring the combustion value of flame-retardant building materials Instrument for measuring the combustion value of flame-retardant building materials Hebi Yinte Instrument and Meter Factory


Testing:

With the calorific value testing instrument powered on, press the on/off key to start it up.

Press the set key, then modify the parameters (sulfur, hydrogen, water) by serial number, and then press the reset key to return to the start interface.

Press the calorific value key and enter the sample weight.

Press the calorific value key again and enter the additive weight.

Continue pressing the calorific value key, and the instrument will start running. The experiment is completed.


Installation steps:
(1) Install the pressure reducer:
Install the oxygen pressure reducer on the oxygen cylinder outlet. Before installation, slightly open the oxygen cylinder valve to blow out impurities and prevent dust and moisture from entering the pressure reducer. When opening the valve, ensure the cylinder outlet does not face anyone to prevent injury from high-pressure gas. (The oxygen cylinder should be placed away from flammable materials and environments.)
(2) Install the oxygen filling device:
Connect one end of the high-pressure oxygen tube of the oxygen filling device to the outlet of the oxygen pressure reducer. Open the oxygen cylinder valve and slowly adjust the pressure reducer handle until the low-pressure gauge indicates 3.0 MPa.
(3) Connect the wires:
Connect one end of the power cable provided with the equipment to the power interface of the calorimeter main unit, and the other end to a compliant 220V, 50Hz AC power source. (Warning: The 220V, 50Hz AC power must have a reliable ground wire.)

New oxygen bombs and newly replaced components (bomb cylinder, bomb head, connecting ring) must undergo a 20.0 MPa hydraulic pressure test and be confirmed problem-free before use. Additionally, regularly inspect structures related to the oxygen bomb's strength, such as the threads of the bomb cylinder and connecting ring, the air inlet valve, air outlet valve, and the connection points between the electrodes and the bomb head. If significant wear or looseness is found, repair should be conducted, and the component must pass a hydraulic pressure test before reuse.

Industry Category
Product Category
Brand: 英特儀器
Spec: ST-9000D
Stock: 13
Manufacturer:
Origin: China / Henan / Hebishi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 邮箱| 江陵县| 瑞丽市| 西华县| 广元市| 朝阳区| 定陶县| 乌拉特后旗| 海阳市| 偏关县| 乌鲁木齐县| 水城县| 房产| 库车县| 闸北区| 拉萨市| 昌平区| 桐梓县| 崇州市| 厦门市| 射阳县| 平远县| 连城县| 三原县| 察隅县| 彭山县| 高要市| 烟台市| 沛县| 石楼县| 宝鸡市| 云阳县| 肥东县| 二连浩特市| 临泉县| 搜索| 花垣县| 邳州市| 申扎县| 自治县| 芦溪县|