尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Diaphragm aerator - China Supplier
China Diaphragm aerator - China Supplier

Diaphragm aerator

Price:Negotiable
Industry Category: Environment Industry
Product Category:
Brand:
Spec:


Contact Info
  • Add:宜興市高塍鎮(zhèn), Zip: 214214
  • Contact: 周學(xué)靜
  • Tel:0510-87896910
  • Email:1312171372@qq.com

Other Products

Description
Additional Information

 

I. Connection Method and Installation of Aeration Pipes:
       The aeration device consists of aerators, air distribution pipes, tees, crosses, elbows, regulators, connectors, cleaning devices, etc. The air distribution pipes are typically arranged in a ring layout. The density of aerators is determined based on the air supply volume and the shape of the tank. The connection between the aerators and the air distribution pipes uses G3/4 threaded connections, with the base having internal threads (fixed to the air distribution pipes) and the aerators having external threads. During installation, first secure the regulator to the tank bottom with expansion bolts according to the required dimensions, then fix the air distribution pipes to the regulator using clamps. To prevent damage to the aeration device from other operations, such as welding sparks and construction activities like concrete pouring, the aerators must be installed after the civil engineering work is completed and before filling the tank with water. To check for leaks in the pipes and connections, fill the tank with water to a depth about 10 cm above the aerators and conduct a leak test. Then, supply air and promptly address any leaks found at the pipe connections before正式投運(yùn)。
II. Main Technical Parameters:
        Aerator dimensions: Φ215mm, 260mm
        Service area: 0.25-0.55m2/unit, 0.35-0.75m2/unit
        Average pore size of the aeration membrane during operation: 80-100 microns 
        Air flow rate: 1.5-3m3/unit·h 
        Overall oxygen transfer coefficient: kla (20℃) 0.204-0.337min-1 
        Oxygen utilization rate: (water depth 3.2m) 18.4-27.7% 
        Oxygenation capacity: 0.112-0.185KgO2/m3·h 
        Oxygenation power efficiency: 4.46-5.19KgO2/kwh 
        Aeration resistance: 180-280mmH2O 
        The design of the air pipes should consider pressure balance, preferably forming a ring network. Each group of inlet pipes should be equipped with valves to facilitate adjustment of the air volume. Design flow velocity for air pipes: main pipes 10-15 m/s; branch pipes 5 m/s. Installation height of the aerator surface from the tank bottom: 270mm, 250mm, and 200mm for the push-plate type.

Industry Category Environment Industry
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Me 砀山县| 綦江县| 黄大仙区| 错那县| 历史| 甘泉县| 陇川县| 蒙阴县| 惠安县| 镇赉县| 六枝特区| 新宁县| 应用必备| 微山县| 修文县| 灵丘县| 寻乌县| 平顶山市| 河曲县| 福建省| 湛江市| 迁西县| 清徐县| 公主岭市| 衡阳县| 武城县| 信阳市| 翁源县| 泸州市| 金阳县| 日照市| 桐乡市| 鸡泽县| 蒙自县| 保山市| 镇雄县| 洞头县| 鲁甸县| 富锦市| 黄骅市| 金堂县|