尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier
China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier

Shield synchronous grouting material for subway shield segment synchronous grouting

Price:¥55 /m
Industry Category: Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category:
Brand: 中大恒建
Spec: 20


Contact Info

Other Products

Description
Additional Information

A dry mixture processed from graded dry aggregates, cementitious materials, fillers, admixtures, etc., used for shield grouting engineering.

Shield synchronous grouting material, when mixed with water in a certain proportion and stirred into a uniform slurry, is used alone or with supporting components for backfill grouting behind the shield. Its purpose is to effectively control ground settlement during shield construction, ensure the early stability of the segment lining, and form the first line of defense for lining waterproofing.

I. Product Features

1. High fluidity and excellent filling performance.

2. Cures within a specified time and is not diluted by groundwater before curing.

3. Construction is not restricted by site conditions, with simple procedures, allowing parallel work with other trades, easy operation, and fast construction speed.

II. Scope of Application

Tunnel shield construction, rail transit, stations, etc.

III. Performance Indicators

Note: Shield synchronous grouting material complies with the standard: DB11T 1608-2018 "Technical Specification for Application of Ready-Mixed Shield Grouting Material".

IV. Construction Process

1. During grouting, the shield tail gap should be completely filled and compacted, with a filling coefficient not less than 1.3.

2. The grouting pressure should match the ground stress at the burial depth of the tunnel axis, and the pressure should be uniform.

3. Type I slurry (thin slurry) should be used up within the apparent setting time, and Type II slurry (thick slurry) should be used up within the initial setting time.
Winter Construction

1. Comprehensive measures should be taken during winter construction to ensure slurry quality, and a suitable winter construction plan should be in place.

2. Fluid pipelines such as water tanks and water pipes matched with the mixing machine should be insulated.

3. The slurry pipelines from the mixing machine to the storage tank, as well as the storage tank itself, should be insulated.

4. During winter construction, after each operation, water in equipment and pipelines should be drained promptly to avoid freezing and damaging the equipment.

Industry Category Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category
Brand: 中大恒建
Spec: 20
Stock: 19
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 中牟县| 宁乡县| 英吉沙县| 靖安县| 宜昌市| 镇平县| 临泉县| 仪陇县| 西乌珠穆沁旗| 清徐县| 宁陵县| 革吉县| 胶州市| 六盘水市| 南靖县| 斗六市| 苏尼特右旗| 伊通| 漾濞| 福州市| 祁阳县| 华坪县| 甘泉县| 乌恰县| 富蕴县| 雅江县| 马尔康县| 长宁县| 乡城县| 桦南县| 繁昌县| 松溪县| 白朗县| 德清县| 吴桥县| 策勒县| 阳山县| 白山市| 九龙城区| 桐梓县| 繁峙县|