尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement - China Supplier
China Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement - China Supplier China Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement - China Supplier

Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement

Price:¥4 /m
Industry Category: Construction & Building Materials
Product Category:
Brand: 中大恒建
Spec: 25


Contact Info

Other Products

Description
Additional Information

Grouting is performed using a dedicated integrated grout preparation and injection machine. The grouting material features micro-expansion, high fluidity, early strength, no bleeding, and extended operability. It not only fills voids but also compensates for or repairs defects in the secondary lining concrete, thereby enhancing the overall quality of the lining concrete.

II. Characteristics of the Tunnel Arch Crown Grouting Process with Formwork:

1. The top of the secondary lining formwork is pre-embedded with grouting pipes and grout vent holes, which also serve as inspection holes to check the fullness of the arch crown concrete.

2. The grouting equipment includes WX-RPC grouting pipes (hereinafter referred to as RPC pipes), micro-expansion slow-setting early-strength filling mortar, and an integrated grout preparation and injection machine. The equipment is simple, easy to move, and operate.

3. The operation is straightforward; grouting for one section of the secondary lining takes only about 2 hours and does not interfere with the normal secondary lining construction schedule.

4. Grouting with formwork can begin when the concrete initially sets. The grouting pressure is significantly higher than that applied after formwork removal, improving the integrity between the lining concrete and the grout, and repairing various concrete defects.

5. During grouting with formwork, the secondary lining concrete is protected by the trolley formwork and remains undamaged. Typically, the concrete pouring pressure exceeds 6 MPa, while the grouting pressure generally does not exceed 1.0 MPa.

III. Key Points of the Tunnel Arch Crown Grouting Process with Formwork:

1. The construction process involves pre-embedding radial grouting pipes in the trolley. Grouting is performed through these pipes promptly 2 hours after the secondary lining construction is completed. The operation can be carried out using a dedicated integrated grout preparation and injection machine. The grouting material exhibits micro-expansion, high fluidity, early strength, no bleeding, and slow-setting properties. It not only serves to fill voids but also compensates for or repairs defects in the secondary lining concrete.

Industry Category Construction & Building Materials
Product Category
Brand: 中大恒建
Spec: 25
Stock: 32321
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經營性-2023-0192
ChatGlobal Chat Me 虎林市| 化德县| 永泰县| 五指山市| 安达市| 手游| 天峻县| 西昌市| 栖霞市| 关岭| 北碚区| 岳西县| 武宣县| 乐亭县| 枝江市| 葫芦岛市| 秀山| 资兴市| 新竹县| 阿尔山市| 无为县| 龙南县| 芜湖县| 闽侯县| 方山县| 格尔木市| 扎赉特旗| 宜兰县| 原阳县| 固安县| 治多县| 潮安县| 南皮县| 洛宁县| 林周县| 探索| 黄梅县| 当雄县| 莒南县| 木里| 视频|