尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Airport Pavement Quick Repair Material for Slab Replacement in Airfield Areas, Rapid Repair Material for Surface Spalling and Potholes on Airport Pavements - China Supplier
China Airport Pavement Quick Repair Material for Slab Replacement in Airfield Areas, Rapid Repair Material for Surface Spalling and Potholes on Airport Pavements - China Supplier China Airport Pavement Quick Repair Material for Slab Replacement in Airfield Areas, Rapid Repair Material for Surface Spalling and Potholes on Airport Pavements - China Supplier China Airport Pavement Quick Repair Material for Slab Replacement in Airfield Areas, Rapid Repair Material for Surface Spalling and Potholes on Airport Pavements - China Supplier China Airport Pavement Quick Repair Material for Slab Replacement in Airfield Areas, Rapid Repair Material for Surface Spalling and Potholes on Airport Pavements - China Supplier

Airport Pavement Quick Repair Material for Slab Replacement in Airfield Areas, Rapid Repair Material for Surface Spalling and Potholes on Airport Pavements

Price:7
Industry Category: Construction & Building Materials
Product Category:
Brand: 中大恒建
Spec: 25


Contact Info

Other Products

Description
Additional Information

Airport runway rapid slab replacement technology is primarily applied in areas such as main runways, taxiways, aprons, and support zones, enabling the reopened use within 1-2 hours after repair.

The high-performance rapid airport slab replacement material developed and produced by our company forms a dense structure after hardening, with high early strength, fast setting time, excellent bonding capability with concrete materials, and certain micro-expansion properties, along with good corrosion resistance. It is convenient for on-site use and suitable for rapid pavement repair and construction.

Main construction process:

① Marking and delineation: Select the area to be repaired. Vehicles, led by a guide car, proceed to the construction area. First, carry out pavement protection (laying colored stripe cloth, etc.) and position the equipment. (Completed in 10-20 minutes)

② Demolition: Use two breakers and two excavators to remove the concrete slab within the marked area, to full depth. Then use pneumatic picks to chisel away any remaining concrete, ensuring uniform chiseling depth. Loose concrete around the edges and at the bottom of the pit must be thoroughly removed. Chiseling should proceed from the inside out to avoid edge damage. (Completed in 50-60 minutes)

③ Cleaning: Use excavators to remove large concrete blocks from the pit. Then use high-pressure air guns to clean cement fragments or dust from the sides and bottom of the pit. Rapidly remove the demolished concrete debris with waste removal vehicles. (Completed in 20 minutes)

④ Mixing: Calculate the amount of repair material needed based on the area to be repaired (calculated per individual pavement slab) to ensure continuous paving. Use 0.5-cubic-meter mixers; four mixers can prepare 2 cubic meters of material at once. First, dry mix the rapid slab replacement material Part A and Part B in the mixer. After thorough mixing, add clean water, with the water-cement ratio based on the test report, and mix until uniform. Control the water-cement ratio carefully; the mixed rapid slab replacement material must not bleed. (Completed in 50 minutes)

⑤ Paving: Before paving, lay colored stripe cloth around the pit to prevent material from contaminating the pavement. Then pour the uniformly mixed repair material into the pit and immediately compact it with a vibrator, paying attention to edges and corners to ensure dense filling. Avoid over-vibrating at any single spot; stop when the concrete no longer sinks, no bubbles emerge, and a slurry surface appears. Level with a screed and control the elevation. (Completed in 10 minutes)

⑥ Grooving: Use a grooving machine to create grooves based on the existing pavement conditions. (Completed in 20 minutes)

⑦ Joint cutting: About 1 hour after the final set of the curing material, cut expansion joints at the original transverse and longitudinal joint locations and inject sealant. In windy conditions, cover with plastic film for curing. (Completed in 20 minutes)

⑧ Opening to traffic: The repaired area can be opened for use 2 hours after the final set of the repair. If conditions allow, extending the curing time is more beneficial for material performance.

Industry Category Construction & Building Materials
Product Category
Brand: 中大恒建
Spec: 25
Stock: 34321
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 汝城县| 德昌县| 洛宁县| 正镶白旗| 彭州市| 宜宾县| 梁山县| 吕梁市| 武安市| 蓬安县| 平谷区| 洛南县| 青岛市| 独山县| 海晏县| 泉州市| 八宿县| 万载县| 千阳县| 临湘市| 志丹县| 嘉定区| 嘉荫县| 财经| 广德县| 珠海市| 宁远县| 临湘市| 宜丰县| 如皋市| 宝山区| 瑞丽市| 洞口县| 启东市| 沧州市| 陕西省| 连平县| 固安县| 兴国县| 寿光市| 临清市|