尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Airport runway ground subsidence void grouting cement geopolymer micro-expansion cement - China Supplier
China Airport runway ground subsidence void grouting cement geopolymer micro-expansion cement - China Supplier China Airport runway ground subsidence void grouting cement geopolymer micro-expansion cement - China Supplier

Airport runway ground subsidence void grouting cement geopolymer micro-expansion cement

Price:¥5 /m
Industry Category: Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category:
Brand: 中大恒建
Spec: 25


Contact Info

Other Products

Description
Additional Information

There are three main forms of interlayer voiding defects in cement concrete pavement structures: ① Interlayer voiding between the subgrade and base course (cushion course) caused by uneven settlement of the subgrade. ② Interlayer voiding between the subbase (cushion course) and base course caused by traffic loads and water action at cracks and joints. ③ Interlayer voiding between the slab and base course.

Airport pavement grouting reinforcement technology is used to address more severe defects such as foundation voiding, sinking, displacement, and step faults. The geopolymer material selected for this technology is a mixture composed of polymer materials, micro-expansion agents, mineral admixtures, inorganic cementitious materials, and other components. After rapid mixing with water, it is used as a grouting material for subgrade reinforcement and filling.

General construction process:

1. Hole Layout: Based on the detection positioning marked by void detection and deflection testing, locate the hole positions on each defective slab and mark them clearly.

2. Drilling: Use a 16mm diameter drill bit to drill holes, with the drilling depth penetrating the cement slab and base course, reaching the top surface of the roadbed (i.e., drilling through the entire rigid structural layer).

3. Hole Cleaning: Promptly clean the dust and powder brought out by the drill rod around the holes using cleaning tools; use an air compressor to seal the hole channel and blow away dust inside and around the hole.

4. Grout Preparation: The geopolymer grouting material must be strictly mixed according to the water-cement ratio. For this experimental section, the water-cement ratio of the geopolymer grouting mixture is 0.33. Mark the water level inside the mixing tank during grout preparation. After daily construction, the mixing tank should be cleaned promptly.

5. Grouting: Start the grouting equipment, adjust the pressure to the designed grouting pressure (1.5 MPa), and conduct a trial grouting observation. Begin grouting, maintain stable pressure during grouting, and stop immediately when the grouting pressure exceeds the designed pressure of 1.5 MPa or when the grouting equipment piston stops for more than 5 seconds. Withdraw the grouting head and move to the next hole.

6. Hole Sealing: After grouting operations, promptly seal the grout overflow holes with wooden plugs and use geotextile to wipe off any grout overflow around the grouting holes.

7. Curing: The curing time for slabs grouted with ordinary geopolymer grouting material should not be less than 24 hours. For fast-setting geopolymer grouting material, traffic can be opened 2-4 hours after curing. Aircraft traffic is prohibited during the curing period.

Industry Category Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category
Brand: 中大恒建
Spec: 25
Stock: 323233
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 延庆县| 梓潼县| 防城港市| 汕尾市| 沾益县| 土默特左旗| 松溪县| 涞源县| 德兴市| 崇仁县| 辉南县| 新竹市| 皋兰县| 潼关县| 蒲城县| 尤溪县| 黄浦区| 独山县| 洪江市| 克山县| 金阳县| 蒙阴县| 千阳县| 永川市| 文安县| 宜丰县| 广宗县| 泗水县| 札达县| 吉安市| 宝坻区| 舒城县| 凤翔县| 新源县| 五莲县| 西林县| 嘉义县| 寿光市| 武陟县| 江油市| 米易县|