尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier
China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier

Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier

Price:Negotiable
Industry Category: Construction & Building Materials/Thermal Insulation Materials/Other Insulation Materials
Product Category:
Brand:
Spec:


Contact Info
  • Address:長安區(qū)東勝廣場B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

Main specifications of the prefabricated folding plate dam flood control sub-dike:
Per set: 10m
Unit width of sub-dike: 1m
Applicable dike materials: sandy loam, loam, clay
Design wind speed: 6.0m/s
Design river width/wave height: 4km/0.3m
Gross weight: 286kg
Net weight: 235kg
Construction speed: 60 minutes for 100 people/km
Structural principle of the prefabricated folding plate dam flood control sub-dike
1. Structural composition and function
Main components of the prefabricated folding plate dam flood control sub-dike:
(1) Corner frame: Made of aluminum alloy profiles connected by shafts, serving as the support framework of the dam body.
(2) Crossbeam: Composed of aluminum alloy square materials connected by **joints, acting as the connecting support members of the dam body.
(3) Water-retaining panel: Made of corrugated fiberglass material, quickly linked via hinges and connected to the crossbeam as a whole through **fixing devices.
Its functions: first, as a connector to link adjacent corner frames, forming the load-bearing carrier of the dam body;
second, as a rigid connecting plate.
(4) Rubber elastomer: Made of high-quality rubber with elastic functionality, used for sealing and water retention between adjacent support panels.
(5) Positioning fixing pile: Formed by pressing round steel.
2. Working principle
The prefabricated folding plate dam flood control sub-dike applies the principle of face rockfill dams in hydraulic engineering. Multiple corner frames, crossbeams, and water-retaining panels are connected to form a rigid sub-dike body, with the water-retaining panels serving the water-blocking function of a face rockfill dam. During construction, it is embedded into the dike foundation soil to prevent seepage around the structure.

Industry Category: Construction & Building Materials/Thermal Insulation Materials/Other Insulation Materials
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 资兴市| 彭州市| 平南县| 特克斯县| 金川县| 会理县| 文成县| 威宁| 新巴尔虎左旗| 丰顺县| 嘉荫县| 牟定县| 宜兴市| 拉孜县| 海安县| 四川省| 双牌县| 宣武区| 玛纳斯县| 云龙县| 宁乡县| 安多县| 英吉沙县| 合水县| 金阳县| 宣汉县| 陆良县| 林甸县| 青岛市| 进贤县| 如皋市| 龙川县| 称多县| 应城市| 东港市| 凤山市| 山阳县| 鹰潭市| 庆城县| 建阳市| 徐州市|