尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Precautions for Using Steam Generators - China Supplier
China Precautions for Using Steam Generators - China Supplier

Precautions for Using Steam Generators

Price:¥10000 /t
Industry Category:
Product Category:
Brand: 納德
Spec: ND-1050


Contact Info
  • Add:湖北省天門市經(jīng)濟(jì)開發(fā)區(qū)緯五路以南、接官路以東300米, Zip: 431700
  • Contact: 范天煜
  • Tel:15271210888
  • Email:2381609225@qq.com

Other Products

Description
Additional Information

Precautions during use, I have briefly summarized these points. Any omissions are welcome to be supplemented.

(1) The steam generator strictly prohibits the use of well water, river water, or lake water, as untreated water contains high mineral content. Although some water may appear clear to the eye without turbidity, after repeated boiling in the boiler's inner tank, the minerals in untreated water will undergo more severe chemical reactions. They will adhere to the heating tube and liquid level controller, leading to the following issues:

(a) Excessive scale on the heating tube surface will prolong heating time and increase power consumption.

(b) Excessive scale on the heating tube surface will significantly reduce the heating tube's lifespan.

(c) Excessive scale on the liquid level controller will cause malfunction, failure to operate, and may result in the heating tube burning out.

(2) This machine should be operated by designated personnel who have thoroughly read the instruction manual. It is essential to follow the warning labels on the machine and the operating instructions.

(3) When using a three-phase power supply, connect the wire labeled "N" to the neutral line of the power supply, and connect the three wires labeled "live wire" to the A, B, and C phase live lines of the power supply, respectively.

(4) The machine's exterior must be grounded.

(5) Before each startup, check whether the power supply is normal and ensure the water tank is filled.

(6) After each shutdown, promptly drain the water and steam from the steam generator boiler's inner tank and turn off the main power supply. Otherwise, the gas inside the machine will cool and turn into false gas. The next day, when starting up, the pressure will rise quickly, but only water will come out when the valve is opened.

(7) During operation, pay attention to timely blowdown. It is best to perform blowdown twice a day. Blowdown should be carried out at a pressure of 0.15 MPa to prevent pipeline blockage. Ensure the blowdown pipeline is properly connected to avoid scalding.

(8) Proper use of the machine will significantly extend its lifespan and save electricity costs.

Industry Category
Product Category
Brand: 納德
Spec: ND-1050
Stock: 1000
Manufacturer:
Origin: China / Hubei / Tianmenshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 齐河县| 博罗县| 邯郸市| 威远县| 牟定县| 七台河市| 蒙城县| 青海省| 岳池县| 巢湖市| 天峻县| 大安市| 新田县| 习水县| 本溪| 石台县| 湘乡市| 民和| 湟中县| 巴马| 东辽县| 浑源县| 永修县| 九台市| 昔阳县| 临夏县| 德江县| 临颍县| 通辽市| 青河县| 新丰县| 鱼台县| 东至县| 通化市| 峡江县| 黄大仙区| 宝坻区| 嘉峪关市| 衡阳市| 略阳县| 灯塔市|